21 January 2021 By hsavary.com 0 likes Non classé The works on all fronts The kitchen constructor puts the gas mains before install the cuisine piano. During this time, the terrace is cleaned and the hatch checked. Concerning the Chef, he’s washing dishes and utensils. Partager